LIFE Center Standoff Panels
Completed by 2025
Location: Logan, Kansas
General Contractor: McCownGordon Construction
Architect: HFG Architecture
Scope: Custom Panel Design and Installation
3
Solutions Offered
2
Trades Involved
$82K
Project Value
Services
- TotalStation Scanning of edifice to ensure precise measurement
- VDC design applied to custom paneling
- Full Panel Installation
Project Details
The Logan LIFE Center is such a fascinating project. This new construction connects Logan’s existing high school to a new grade school for children aged pre-k to 4th grade, along with an attached nursing home for up to 36 retirees. For such a specialized project, the main entrance was given special attention. The big question was going to be how to make this exterior-spanning design in a way that is both durable and precise.
“Durable and precise” is the name of the game for Kruse’s architectural metal division. The same precision offered by our VDC department in the coordination of plumbing and mechanical systems out at Logan is expanded to the exterior metal. With intense control of the area, matching model coordinates with real world positions, every panel can fit perfectly the first time, seamlessly bringing this exciting model design into the real world.
Kruse Corp Mechanical Contractors
Let’s Build Your Future, Together
From HVAC solutions and sheet metal work to welding and electrical systems, our experienced team is here to guide you every step of the way.
