Arrowhead Facilities
Completed by 2024
Location: Kansas City, Missouri
General Contractor: Turner Construction
Architect: N/A
Scope: Kitchen Renovation, Training Area ATU Install
4
Solutions Offered
3
Trades Involved
$427K
Project Value
Services
- Kitchen Plumbing/Exhaust Renovation
- ATU Install with Accessory Duct Fabrication
Project Details
Kruse’s work with the home of the Kansas City Chiefs has expanded in a big way with two large jobs, both completed in a tight 6-week window, and ahead of schedule before the football season kicks off.
Our first was a profound renovation, converting a storage area into the new Chiefs Café that now feeds 300 staff members at a time, including the players. Kruse supplied all mechanical and plumbing tie-ins for a high-demand professional kitchen. The real event for this was the exhaust hoods. With the tall design of the building, there was twenty feet between the subceiling and the roof. Our solution was to build the risers on-site and drop the ductwork in through the roof via crane.
At the same time, Kruse also installed the first ever HVAC service on the Chiefs practice facility. This comprised two enormous air turnover units that required two equally enormous ductwork risers to supply and circulate fresh and conditioned air. This exceptional sizing was fulfilled via our second-to-none fabrication shop in Wichita, providing rapid turnover and a product the Chiefs can trust for the long-haul.
Kruse Corp Mechanical Contractors
Let’s Build Your Future, Together
From HVAC solutions and sheet metal work to welding and electrical systems, our experienced team is here to guide you every step of the way.
